Develop a 3,000-km, four-to-six-lane Parikrama Path around Gujarat
Bharatiya Janata Party · Gujarat Legislative Assembly Election 2022
Last updated 10 Oct 2026
What does this status mean?
The term is active and there is no evidence of action or reversal.
Status describes delivery. Confidence describes how strong the available evidence is.
Original manifesto wording
“We will develop the first-of-its-kind Parikrama Path of 3,000 km encircling the whole state with 4-6 lane roads/highways by constructing: • South Eastern Peripheral Highway (India’s longest coastal highway, 1,630 km) • North Western Peripheral Highway (1,380 km).”
Our Assessment
The 2023-24 budget announced a Parikrama Path scheme to connect border areas. April 2023 reporting described a 3,533-km blueprint largely using existing roads and filling missing links, which differs materially from the manifesto's 3,000 km of four-to-six-lane roads and its two named peripheral highways. A later official report lists 21 roads completed under a separate coastal-highway plan, but does not identify them as 4-6-lane Parikrama Path sections. No verified length of the two promised peripheral highways has been found. Planning is recorded; delivery against the specified road standard is Pending.
The reasoning behind the verdict
Why this assessment?
Reviewed
01 · Delivery status
Why pending?
The state announced a Parikrama Path scheme in its 2023-24 budget and a subsequent blueprint described a wider ring assembled mainly from existing roads. That is planning, but the available records do not identify completed four-to-six-lane sections of the promised 3,000-km Parikrama Path or establish construction of its 1,630-km and 1,380-km named peripheral highways. Separate coastal-road completions cannot safely be counted toward this specific target. The delivery status remains Pending.
The manifesto's two component lengths add to 3,010 km, while its headline target says 3,000 km. The original figures are preserved. No completed-kilometre progress bar is shown without a route-level, lane-standard-comparable numerator.
02 · Strength of evidence
Why medium confidence?
The manifesto, 2023-24 budget summary and government road report document the pledge, announcement and other road work. Neither the 4-6-lane Parikrama alignment nor route-level completed kilometres are published in these sources; confidence in the exact delivery position is Medium.
What would help us reassess?
The documents that could clarify delivery of this commitment.
- Approved alignment and detailed project reports for both named peripheral highways
- Tender, award and physical-progress reports identifying four-to-six-lane Parikrama sections
- Completed and operational kilometres by segment, excluding pre-existing roads and unrelated coastal-road upgrades
- Reconciliation of the 3,000-km headline and 3,010-km component lengths
Status describes delivery. Confidence describes the evidence.
Read our methodology ↗Sources & Evidence
Governor's address: separate coastal-road project progress
Gujarat Budget Analysis 2023-24: Parikrama Path announcement
Report on Parikrama Path blueprint and existing-road approach
BJP Gujarat Assembly 2022 manifesto
Promise Timeline
The state reported 21 road works completed under a separate coastal-highway plan; it did not identify these as delivered Parikrama Path kilometres.
View sourceReporting described a 3,533-km peripheral-road blueprint using existing routes and missing links, rather than confirming the manifesto's two four-to-six-lane highways.
View sourceThe 2023-24 budget announced a Parikrama Path scheme to connect border areas; it did not document completed kilometres.
View sourceRelated Promises
Provide all-weather roads and adequate drainage in every tribal village
Upgrade small tribal-area bridges and causeways for all-weather access

Have evidence on this promise?
Help us track this promise by submitting news articles, government orders, or any other evidence you've found.
Submit Evidence