“We will be the first large state to achieve the feat of having 50% of the total energy production from renewable sources and thus safeguarding the energy interests of the state.”
Our Assessment
On MNRE's utility-electricity measure, renewables supplied 46.31% of Gujarat's electricity generation in FY2025–26, below the promised 50%. Electricity generation is the relevant available indicator; it does not measure all primary energy, such as transport fuels. Karnataka recorded a renewable electricity share above half in the same dataset, so Gujarat's first-large-state condition is also not established. Delivery has advanced substantially, but the complete commitment remains unmet.
The reasoning behind the verdict
Why this assessment?
Reviewed
01 · Delivery status
Why partially done?
Actual output remains below the numerical threshold, and the leadership condition has not been demonstrated.
FY2025–26. Measures electricity generation, including renewable hydro; does not measure installed MW or all primary-energy use. The bar covers the 50% component only.
02 · Strength of evidence
Why high confidence?
MNRE's annual electricity statistics provide comparable state-level generation figures.
What would help us reassess?
The documents that could clarify delivery of this commitment.
- A later full-year Gujarat generation mix showing at least 50% from renewables
- A consistent definition of 'large state' and evidence supporting the first-state condition
- Clarification if 'total energy' includes fuels outside electricity, for which this dataset is only a proxy
Status describes delivery. Confidence describes the evidence.
Read our methodology ↗Sources & Evidence
Promise Timeline
FY2025–26 closed with Gujarat's renewable electricity generation share at 46.31%.