Build an airport metro connection to Sardar Vallabhbhai Patel International Airport
Bharatiya Janata Party · Gujarat Legislative Assembly Election 2022
Last updated 15 Oct 2026
What does this status mean?
Meaningful delivery has occurred, but the stated commitment is incomplete.
Status describes delivery. Confidence describes how strong the available evidence is.
Original manifesto wording
“Construct a dedicated Airport Express Metro Line to ensure high-speed connectivity from Ahmedabad to the Sardar Vallabhbhai Patel International Airport.”
Our Assessment
A dedicated metro connection to Ahmedabad’s airport has advanced beyond a general proposal. GMRC awarded airport-line geotechnical investigation to KCT Consultancy on 27 February 2026 and detailed design work to SYSTRA on 3 March 2026. The Union Cabinet approved Phase 2A on 10 June 2026: a 6.032-km corridor from Koteshwar Road to the airport with five stations, including an underground airport station, at an estimated completion cost of ₹2,169.04 crore. GMRC subsequently invited civil works for the elevated and underground sections in August 2026. These are meaningful procurement and project-development steps toward the promised airport rail access. The line has not been verified as completed or open to passengers, and the published project does not yet establish a separate high-speed express operating pattern. The promise is therefore Partially Done. The actual airport-link project receives credit even though it is called Phase 2A rather than Airport Express.
The reasoning behind the verdict
Why this assessment?
Reviewed
01 · Delivery status
Why partially done?
Awarded investigation and design contracts and subsequent civil procurement show substantive preparation for the airport link. The central deliverable—an operational metro connection serving airport passengers—remains unfinished.
02 · Strength of evidence
Why high confidence?
The Union Cabinet’s sanction, GMRC’s official contract-award register and civil tender, and the appointed designer’s announcement consistently document the airport corridor and its preparatory implementation. This supports high confidence in a partial verdict without implying that trains already serve the airport.
What would help us reassess?
The documents that could clarify delivery of this commitment.
- Award and mobilisation of the main civil works contract, with verified physical construction progress
- Completion, safety certification and the date airport passenger services begin
- Published service plans showing travel time, frequency and whether express operation is provided
Status describes delivery. Confidence describes the evidence.
Read our methodology ↗Sources & Evidence
GMRC: Awarded airport-line investigation and design contracts
GMRC: Phase 2A airport-line civil works tender GMRC/CONS/STNS+VDCT+UG/PH-2A/2026
BJP Gujarat Assembly Election Manifesto 2022 — printed page 34
Cabinet approves Ahmedabad Metro Phase 2A from Koteshwar Road to the airport
SYSTRA confirms awarded airport-link detailed-design contract
Promise Timeline
GMRC’s civil tender covered approximately 4.97 km of elevated viaduct, four elevated stations, and a 1.01-km underground section with an airport station. Invitation of bids does not establish completed construction.
View sourceThe Union Cabinet approved the 6.032-km Koteshwar Road–airport metro corridor with five stations and an estimated completion cost of ₹2,169.04 crore.
View sourceGMRC awarded detailed-design consultancy for the airport link and GIFT City extension to SYSTRA MVA Consulting (India) Private Limited.
View sourceGMRC awarded geotechnical investigation for the proposed airport line and GIFT City extension to KCT Consultancy Services LLP.