Support Nanda Devi Raj Jaat with greater grandeur
Bharatiya Janata Party · Uttarakhand Legislative Assembly Election 2022
Last updated 30 Sept 2026
What does this status mean?
Implementation is progressing towards the commitment.
Status describes delivery. Confidence describes how strong the available evidence is.
Original manifesto wording
“We will spare no effort to ensure that the Nanda Devi Raj Jaat takes place with increased grandeur and fanfare, by providing all necessary support.”
Our Assessment
Preparations for the Nanda Devi Raj Jaat have progressed from administrative planning to infrastructure procurement and specific project sanctions. Since 2024-25, the state has directed route, sanitation, parking, telecom, medical, cultural and safety arrangements; sought ₹400 crore in central assistance; tendered Raj Jaat-specific road works; and sanctioned further parking, toilet and helipad infrastructure. Some route-repair works have faced implementation delays. The main Raj Jaat was postponed from 2026 to 2027 because of high-altitude weather and safety concerns, so the event itself has not yet taken place.
Sources & Evidence
Nanda Devi Raj Jat yatra postponed by a year due to erratic climate
Uttarakhand to set up digital tracking, telecom infra on Nanda Raj Jat route
BJP Uttarakhand Assembly Election Manifesto 2022
Promise Timeline
The Uttarakhand government approved new infrastructure works linked to preparations for the Nanda Devi Raj Jaat, including ₹1.36 crore for surface parking and toilets near the Wan Padav helipad, ₹40.22 lakh and ₹30 lakh for temporary parking facilities at Mundoli, and the remaining ₹1.88 crore for construction of the Wan helipad in Chamoli district.
View sourceA ₹1.21 crore allocation had been made for repair of 48 km of the Nanda Raj Jaat walking route, although work had not yet begun because administrative approval was still pending.
View sourcePWD granted approval for blacktopping and improvement of the Nalgaon–Bhatiyana motor road in Chamoli specifically in connection with the Maa Nanda Devi Raj Jat Yatra.
The Raj Jaat organising committee postponed the main pilgrimage from 2026 to 2027, citing unsafe and unpredictable September weather in the high Himalayas, including risks from snowfall and extreme conditions.
View sourceUttarakhand PWD floated a tender specifically under the Nanda Devi Raj Jaat 2026 programme for repair and protection works on the 38.53-km Adibadri–Nauti motor road, including damaged walls, causeways and culverts.
View sourceCM Dhami sought ₹400 crore in central assistance for infrastructure required for the Nanda Raj Jaat and invited the Prime Minister to attend the pilgrimage.
View sourceGovernment ordered digital tracking and strengthened telecom arrangements along the approximately 280-km route. A high-level coordination committee, regular reviews, helpline, medical camps, doctors and heli-ambulance arrangements were also directed.
View sourceState government announced that the Nanda Raj Jaat would be organised as a major folk-cultural festival. Directions covered crowd management, alternative routes, parking, drinking water, toilets, eco-tent colonies, electricity, mobile connectivity, cultural promotion and environmental safeguards.
View sourceThe Chief Minister again directed departments to begin advance preparations for the Nanda Raj Jaat scheduled for 2026, alongside planning for the 2027 Kumbh.
View sourceCM Pushkar Singh Dhami directed officials to begin preparations for the upcoming Nanda Devi Raj Jaat. The direction came during a state-level review involving senior officials and district administrations.
View sourceBJP manifesto promised: We will spare no effort to ensure that the Nanda Devi Raj Jaat takes place with increased grandeur and fanfare, by providing all necessary support.